How it works

Keep the checklist.
Fix the proof.

You do not need a new inspection process. You need what happens after a failed item to survive the client conversation.

Pilot stage. Web and iOS simulator are exercised. Physical Android and iPhone field testing is not complete.

1. Failed item

An inspector runs your published checklist at a site. A failed answer can require a photo and a note. The checklist version and site identity are frozen at submission, so later edits cannot rewrite history.

2. Evidence

The photo is attached to that item, that visit and that site — not dropped into a camera roll or a group chat. Access is private and role-scoped.

3. Correction

A corrective action is created automatically. It is assigned with a due date. The assignee uploads after-photos and submits the correction.

4. Verification

An owner or QA manager verifies the correction. Reopening is owner-only and clears the closure record. Every transition is audited.

5. Approved report

Approval creates a numbered report revision with a frozen snapshot. The PDF renders server-side. A share link is tokenized, expiring and revocable; the next request after revocation returns 404.

What we do not replace

ContractProof is not a scheduling, time-tracking, payroll or client-portal suite. If those are your priority, a full janitorial operations platform is the better buy. ContractProof covers the inspection-to-approved-report trail and sits alongside your existing tools.

What we do not claim

See the report